Welcome to Your New Home
Imagine living in a beautiful, modern space that is both maintenance-free and designed with you in mind. Our properties truly redefine what Adult living can be like.
Phase five, six and seven are under construction and we are currently accepting applications. All our phases includes bungalow-townhomes for one-storey models.
Choose one of our spacious two bedrooms, two bathroom, each home includes 9ft ceilings, radiant floor heating, full-size kitchens with appliances, washer and dryer in each townhome, walk-in shower and a patio.
General
Driveway
Exterior patio
High quality, high-efficiency windows
High-efficiency natural gas system for heating, cooling, and radiant floor heating
Single Floor Living
Large Garage
Fully accessible
Storage cupboards
Living Spaces
High-speed wiring
New beautiful hardwood ceramic tile throughout
Neutral colour palette
Radiant floor heating throughout
9-foot ceilings
Roller shade window coverings
Modern ceiling fixtures
Washer and dryer
Individually controlled heating and cooling
Kitchen
Double sink
Backsplash edge
High-speed wiring
Granite modern countertops
Stainless steel appliances
Over-the-range microwave hood/fan
Modern cabinet design and pulls
Chrome faucet with pull-out sprayer
Durable radiant heated floor
Kitchen island with eating bar
Bed & Bath
Cupboard vanity
Ceiling vent to outside
Vanity mirror with lighting
Molded walk-in shower
Chrome faucets and hardware
Durable easy-clean countertop
Durable radiant heated floor
Large windows
Clothing cupboards
Roller blind window coverings
Proposed Site Plan
